Morning of  Mach16, start at boy scout camp (Site 13). Had full team (Daisuke, Callum, Tony, Adam, Andrew, Dexter and Chris) .
Everyone is working hard except the photographer:

Taught a soil installation class at S13, and sincethen have had Adam and Andrew install soils at subsequent sites.
We could not install the lightning rod at S13 (it was too thick for the spacing between the crossbar and hole)

In the afternoon of March 16, went to Santa Ynez Peak (S8). 
Spacing and layout were less not ideal, but came together nicely.


March 17: start day at Exxon (site 5), get briefed, and then do a long carry up a very steep hill.  The little green wagon comes through again.
After helping with the equipment carry, I left Adam, Tony, Daisuke and Dexter, so that Andrew and I could start on Hazard Ranch (site 6).
After return to base for quad disk and NR01 booms, both sites were completed including soils.
It seemed that S6 was not reporting the Tsoil.  Tried reconnecting several times and pressing in wisard, but so far nothing.  We will see if it comes up.


We now have 5 sites left to set up.

  • No labels

1 Comment

  1. According to ncharts, Tsoil.s6 is coming in.