After talking with Chris and Steve earlier today. From memory, please add anything I forgot!

  • Lidar USB stick swaps: only at D and UE. I have 4 USB sticks to bring in from Ethan.
  • Radiometer cleaning: K&Z at D will require climbing, NR01 at UW will require being careful of tsnows and IR sensor field of view.
  • Moving sonics back down if the snowpack permits:
    • At UW: move boom with sonics from 2.5m down to 2m. This will require moving the boom clamp back down the tower, look at Chris's blog post for how he measured the proper height to mount it at.
    • At C: C.1m is currently in the boom at UW, just not plugged into anything. Maybe this could be moved back, the clamp should already be there.
    • Maybe move sonics down at UE and D too, based on what it looks like when we get there.
  • Check if tubing to snowpack barometers is capped, if not cap with spare bulgin caps.
  • Dig out the barrel if necessary
  • No labels