Log in
wiki.ucar.edu
Spaces
Hit enter to search
Help
Online Help
Keyboard Shortcuts
Feed Builder
What’s new
Available Gadgets
About Confluence
Log in
PCAPS Field Project - ISFS
Pages
Blog
Blog
2013
January
2012
November
April
2011
September
May
April
March
February
January
2010
December
November
TRH fan noisy at Playa
Cleaned radiometers and solar panels
kh2o installation
Playa 1 Snow Removal
site 1
site 2 trh
sites 1 and 6 prop vane azimuths
site 2 power
Site 1 Playa notes
Site 4 visit - not reporting
reset TRH at abc2
playa1, abc2 site visits
New inadyn, nidas installed on all systems
Status 19 Nov
pinging stations
hiland3 site visit
site names
wvally4 visit
wslope6 visit
Sensor status 17 Nov
Sonic installed at playa1
hiland3 site visit
abc2 site visit
TRH dropout at eslope5
playa1 visit
Updated sensor status
cellular dropouts last night
power cycle of base radios
eslope5 radiometers upside down
Status of cellular comms
sensor issues
site5.aux soil sensors odd
Humitter problem
Tbaro changes
Checking station cellular status
Site abc flagging and soil install
Site wslope reflagging and soil moving
Site wvally flagging and soil install
Site playa flagging and soil install
Site wslope flagging and soil install
Site river flagging and soil install
Site eslope flagging and soil install
Site hiland flagging and soil install
Draft site visit tasks with mast raise and lower instructions
October
Browse pages
Configure
Space tools
A
t
tachments (0)
Page History
Page Information
Resolved comments
View Source
Export to PDF
Hide Inline Comments
Blog
2010
November
16
Jira links
Sonic installed at playa1
Created by
Gordon Maclean
, last modified on
Nov 16, 2010
Nov 16, around 15:30 MST
Chris installed the sonic head at playa1
playa1
sonic
Overview
Content Tools
{"serverDuration": 80, "requestCorrelationId": "89f1cd8269df384d"}