10:45 - 11:10, Dec 16

Cleaned krypton, v = 2.4. Cleaned up looking domes, frost built up on Rsw.in. Rlw.in looked ok.

Since the battery acted up the other day we decided to move the DSM internal power cable from the power panel board to a serial panel board.

If we continue to have problems with power, next step will be to either replace the power cable or the stack power supply.

new angle on boom, 249.5 magnetic (boom pointing east)

   twh (3/1/11): high-rate u,w suggests mast down 10:58 - 11:09

                           high-rate data indicates kh2o cleaned at 11:01

           (3/3/11): high-rate u and p indicate mast down 10:59 - 11:08