RF15
8/15/25
Tech: Ivana
Takeoff: 0231
Landing: 0828
Pre-flight
-Cycled power on DSM 323 (Left Overhead Rack) 4 times before it connected; check network port on maintenance day
-Changed HOXCIMS (Left 1) cylinder
-Changed NO2/NO (Right 3) cylinder
-Filled Butonal in CN Counter
-Tested VISTV with 800 lumen flashlight
-During power transfer (Ground to Engine), R-10 NOx computer experienced hard shutdown; Users re-started computer and instrument before departing plane
SATCOM (In-flight)
0234 Dropped
0240 Reset
0248 Recovered
0332 Dropped
0338 Reset
0345 Recovered
0430 Dropped
0433 Reset
0439 Recovered
0525 Dropped
0532 Reset
0543 Recovered
0625 Dropped
0643 ResetÂ
0648 Recovered
0736 Dropped
0745 Reset