Post cal results of temperature, temperature range 15C to -20C
Sensor |
mean (error) |
sd (error) |
min to max |
---|---|---|---|
017 |
.019 |
.014 |
-.036 to .001 |
023 |
.017 |
.012 |
-.004 to .030 |
019 |
.016 |
.014 |
-.001 to .032 |
013 |
.000 |
.006 |
-.007 to .010 |
025 |
-.008 |
.011 |
-.034 to .002 |
024 |
.002 |
.008 |
-.011 to .013 |
009 |
-.035 |
.007 |
-.044 to -.022 |
028 |
-.018 |
.007 |
-.028 to -.004 |
027 |
-.011 |
.016 |
-.027 to .02 |
Post cal of RH, two runs from 10% to 90% at 10C and -4C, Gortex still on
Sensor |
mean (error) |
sd (Error) |
min to max |
---|---|---|---|
017 |
-3.3 |
0.9 |
-4.8 to -1.4 |
023 |
-1.7 |
1.2 |
-3.8 to -0.4 |
019 |
-8.6 |
1.2 |
-11.1 to -6.3 |
013 |
0.1 |
0.5 |
-0.7 to 0.8 |
025 |
0.7 |
1.44 |
-2.2 to 2.2 |
024 |
1.1 |
1.7 |
-1.1 to 3.8 |
009 |
-0.6 |
0.6 |
-1.1 to 0.9 |
028 |
0.6 |
1.9 |
-3.6 to 2.6 |
027 |
1.2 |
1.6 |
-2.1 to 2.6 |
Location of SHT sensors through out the project. Some sensors replaced during the project were sent back to Boulder for repairs then the sensor was deployed again
DATE of CHANGE
STATION |
11/28 |
12/07 |
12/12 |
12/13 |
1/15 |
11/16 |
1/17 |
1/18 |
1/27 |
1/28 |
2/6 |
2/7 |
1 |
13 |
|
9 |
26 |
|
|
21 |
|
13 |
|
|
13 |
2 |
15 |
21 |
|
|
|
|
24 |
|
|
|
|
24 |
3 |
20 |
|
|
|
|
|
19 |
23 |
|
|
|
23 |
4 |
19 |
|
|
|
|
25 |
|
|
|
|
|
25 |
5 |
18 |
|
|
|
|
|
|
|
|
9 |
17 |
17 |
6 |
23 |
24 |
|
|
|
|
27 |
|
|
|
|
27 |
7 |
17 |
|
|
|
28 |
|
|
|
|
|
|
28 |