(We took yesterday as a day off, so skipping a day in the burn-in sequence.)
Adam and Andrew have now departed. ISFS crew is Isabel and me. Liz (and soon Bill) join John today for ISS.
A rainy and cold day(!), often driving in cloud. Also a day filled with meetings. Nevertheless, got some things done:
s5: (finally visited Exxon; somewhat muddy)
- power Y cable
- soil core
s7: (pouring at the time, lots of mud)
- installed NR01 (the last sensor in the entire array to be installed)
s8: (to debug TRH that died)
- Had to replace both SHT probe and housing. Not sure yet what happened, but many other TRHs died overnight.
- soil core
- road maintenance by (Isabel's) hand. Note that there was a "gravel slide" into the road about 2 miles west of the site.
Started to organize the base by moving spares into the POD. Note that we somewhat buried the spare 2D sonics in the process.