(We took yesterday as a day off, so skipping a day in the burn-in sequence.)

Adam and Andrew have now departed.  ISFS crew is Isabel and me.  Liz (and soon Bill) join John today for ISS.

A rainy and cold day(!), often driving in cloud.  Also a day filled with meetings.  Nevertheless, got some things done:

s5: (finally visited Exxon; somewhat muddy)

  • power Y cable
  • soil core

s7: (pouring at the time, lots of mud)

  • installed NR01 (the last sensor in the entire array to be installed)

s8: (to debug TRH that died)

  • Had to replace both SHT probe and housing. Not sure yet what happened, but many other TRHs died overnight.
  • soil core
  • road maintenance by (Isabel's) hand.  Note that there was a "gravel slide" into the road about 2 miles west of the site.

Started to organize the base by moving spares into the POD.  Note that we somewhat buried the spare 2D sonics in the process.



  • No labels