Weather: Cool and foggy morning, with overcast conditions for the remainder of the day.
Tasking:
- S1 (SBC Fire Station 18) teardown. Went smoothly save for the following issues:
- A crack formed in the lower collar/pivot point of the tripod assembly. Collar will have to be replaced.
- TRH fan inop.
- Unable to connect to DSM. Site was powered. May be a static IP issue, will investigate in Boulder.
- Tripod leg pads had play, ground on this site compacted. Future tripod installations will have to be releveled during maintenance visits due to soft ground.
- CSAT 3A stiffener brace weld broke, will need to be epoxied
Plan for tomorrow
- S4 (San Marcos Foothills Preserve) teardown. Meeting ranger for access at 8:30 am.