You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Current »

For Will and David on the last maintenance visit:

  • Debug/fix non-reporting d.9m radiometers.  Take a spare V2.7 mote.
  • Clean radiometers
  • Change out lidar USB sticks
  • Move d, ue, and uw lower sonics to 1m
  • Dig out the barrel and move to the ground, if possible and/or needed.
    • Barrel down as of 16:00 May 15, 2023
  • Move crates and equipment out of Quonset Hut
  • Check all guy wire tensions
  • Power cycle Ethan's raspberry pi on UE (pi1).  If not labeled, power cycle both.
  • Remove flag trail markers
  • No labels