Chenning and Khuong working on the pressure measurement system at these times:


June 27, 2008: 

       Morning. Hung the horizontal pressure reference line.
       4:45-5:15 PM. Working on the 1/4 in tubing, connecting them to the pressure transducers.

 June 28, 2008

     9:00-11:00am. Putting 1/16 in couplers to the transducers on the lower array. The tubing on the transducer is hard and the coupler cannot be inserted directly, a heat gun was      used to melt the tubing in order to insert the coupler.
 