Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Date

Position

Tare (g) (g)

Wet (g) (g)

Dry (g) (g)

rho (g/cm^3)

Moist (%)

Moist (%)
EC-5

6/15

soil.a 0-3cm

7.981

74.357

48.354

0.61

39.2

 

6/15

soil.a 3-6cm

7.940

97.473

72.210

0.97

38.0

30

6/15

soil.b 0-3cm

7.945

90.836

67.464

0.90

35.2

 

6/15

soil.b 3-6cm

7.991

98.365

78.623

1.06

29.7

23

6/21

soil.a 0-3cm

7.972

51.536

29.353

0.48

50.1

 

6/21

soil.a 3-6cm

7.940

102.324

68.270

0.91

51.3

27

6/21

soil.b 0-3cm

7.927

59.973

42.641

0.78

39.1

 

6/21

soil.b 3-6cm

7.987

74.350

55.189

0.71

28.8

25

6/26

soil.a 0-3cm

7.972

116.089

79.391

1.08

55.2

 

6/26

soil.a 3-6cm

7.939

120.337

92.536

1.27

41.8

34

6/26

soil.b 0-3cm

7.926

78.270

59.924

0.78

27.6

 

6/26

soil.b 3-6cm

7.984

103.500

84.423

1.15

28.7

21

7/3

soila 0-3cm

7.990

73.581

46.360

0.58

41.0

 

7/3

soila 3-6cm

7.945

96.626

69.548

0.93

40.8

34

7/3

soilb 0-3cm

7.913

105.195

77.396

1.05

41.8

 

7/3

soilb 3-6cm

7.986

103.252

83.068

1.13

30.4

22

 

tare = c(c(7.981,7.940,7.945,7.991),c(7.972,7.940,7.927,7.987),c(7.972,7.939,7.926,7.984),c(7.990,7.945,7.913,7.985))

...

rho = dry/vol[c(2,2,2,2,1,2,1,2,2,2,2,2,2,2,2,2)]

m = array(moist,c(2,2,4))

grav.moist = t(0.5*(m[1,,]+m[2,,]))

grav.comp = t(m[2,,])

ec5 = matrix(c(30,23,27,25,34,21,34,22),ncol=2,byrow=T)

matplot(grav.comp,ec5,xlim=c(0,60),ylim=c(0,60)); abline(0,1,lty=2); abline(-8,1,col=3,lty=2)