The forecasted snow did come, starting about 5AM and continuing off and on through the day.  Accumulation about 2".

Spent the day touring with Terry and later Erik and Sebastian:

  • ISS1: Bill showed us his site
  • DCS
  • Balloon site
  • SH (then ate lunch at the SH grill)
    • sonic is tilted down – I'm guessing that my shim washer slipped out.  We should check the time history of tilts
  • ISFS base, where we met up with E&S, who had never seen some of the satellite sites...
  • DC
    • noticed a drip of water off the top EC150 window
  • CC
  • LC
    • cleaned bird doo from Rsw.in
  • SP
    • entire sonic boom also leaning.  In part because of the T-stake being broken on the opposite guy, so there isn't as much tension.  Again, look at tilts
  • MW
  • drove past the base of MH
  • Back to ISS1, where Bill was cleaning off snow