11 Jan, 2011 On site : John and Ling
1305 clean up radiometers
1338 change the desiccants for the radiometers (2 long and 1 short, the upper right long doesn't need to change)
1356 add the third battery, and add insulation to the battery box to keep them warm (batt-dsm measured 14.44V)
1358 rain gauge, ice blogs