14:15 - 15:15
Clear day, 50% snow cover on ground.
14:23 SHT018 replaced with SHT009
14:28 Mast lowered
14:31 cleaned krypton with water (1.6v to 2.35v), retracted sonic wicks, checkd tower bolts, soil sample taken at main site
14:50 raised mast
14:55 cleaned radiometer domes with water, soil sample at secondary site, sample depths backwards in tupperware
13:14 pounded tower stakes in