On the site: SteveO and Ling 8:40am - 10:10am
Ground is frozen, half Beautiful frosty conditions. Half foot of snow, and icy ice/frost on tree, bushes, and instruments.
1> take pictures ( 8:40am This site is cold, covered with snow, significant different from others, it worthes worthy of pictures taken)
2> clean up sonic and krypton sensors (8:46am) Both were covered with hoar frost (both arms and over sonic transducers, over frame and krypton tubes). Also the krypton tube faces had frost.
3> clean up radiometers (9am)
4> clean up TRH (9am) I'm not positive, but I believe the fan started while we were there (had been stuck?). I removed the tube and blew bits of snow out. The SHT itself was relatively clear.
5> replace reinstalled the krypton backon (electronics on its official bracket, though Joe's cable-tie mount was perfectly fine (reconnected at 9:35am)
6> clean up solar panel (9:35am)
7> take the soil samples (9:50)
8> shoot the boom (10am), measured 77.33degrees