On site-Highland3, SteveO and Ling 2:20-3:40pm
We have done the followings:
1> cleaned pyranometers' screens (2:20pm)
2> redo soil sensors (2:32PM),
Tsoil
3> take soil samples (3pm), marked the two sample boxes as 1-0-3cm (5mm shame of being full)and 1-3-6cm
4> shoot the boom (3:23pm), readings are 254.2 (Steve's) 254.8 (Ling's)
5> break the ice in the rain-gauge (3:32PM), and take the ice out of the rain-gauge
6> take pictures (3:37pm)