1> replaced charge controller, viper down (3:01pm to 3:10pm)
2> stired rain gauge, ice chunk is still seen. (3:11pm)
3> reset the connection from router to its power board (3:05pm)
1> replaced charge controller, viper down (3:01pm to 3:10pm)
2> stired rain gauge, ice chunk is still seen. (3:11pm)
3> reset the connection from router to its power board (3:05pm)